Passivation 45 PT
Passivation 45 PT is based on phosphate preparation for pickling / passivation of steel. The preparation can be used in baths or spray process.
The method of application (Application);
Passivation concentration of 45 PT: 10 ÷ 50%
Process time: 2 to 5 minutes
Process temperature: 20 ÷ 50 ° c